Guna Kimer Dingay-Guna Road Project

Guna Kimer Dingay-Guna Road Project

Guna Kimer Dingay 

Location: within Ethiopia, Amhara Regional State

Project Value:

Contract value: 5,031,000.00 ETB

Name of Client: Samson Cherinet General Contractor

Start Date: July 2020

Progress Status
61%

The road project is entirely located in the Amhara Regional State. The Project Road starts around 2.8km from Kimir Dingay, on Debretabor-Gahena Road and Ends below Guna Mountain. The project road passes through only 3 intermediate control points that is the Guna Mountain Semaetat Monument (~2.56.km), Tele Tower (~4.86.km), Moksh (~7.76.km), and Ergeb Washa (~11.02.km).

Description of actual services provided by your staff within the assignment:


Alternative Routes Assessment and Route Selection taking into consideration

Employer’s requirement stated in the main contract agreement, national and international standards

Fitness for intended purpose

Response to the demands of the society and the local administration

Undertake GPS establishment

Interpret all kind of geotechnical investigations for deep cut, high fill and foundation for major structures

Designing of the roadway and any necessary structures

Design an upgrade for existing section as well as new alignment section of the road to DC5 geometric standard with AC surfacing.

Designing Bridges and culvert structures on the assumption that all existing structures shall be removed and reconstructed in order to meet the required standard

Designing Paved Roadways

Designing Drainage structures

Designing Retaining Walls

Designing erosion protection and energy dissipaters

Designing sediment trap and detention basin

Designing Pavement Markings and Traffic & Direction Signs

Designing Protection Works such as guard rails, gabions, grassing, etc

Preparation of Design document

Preparation of quality assurance/quality control

Preparation of quality management program of implementation

Preparation of construction specification package

Preparation of Environmental Assessment Plan

Preparation of design for ancillary works

Preparation of detailed quantity and Detailed project cost analysis report (in relation to hauling distance and designed pavement thickness)

And other necessary works to meet the Employer’s requirement for fulfillment of completion of the project

The road project is entirely located in the Amhara Regional State. The Project Road starts around 2.8km from Kimir Dingay, on Debretabor-Gahena Road and Ends below Guna Mountain. The project road passes through only 3 intermediate control points that is the Guna Mountain Semaetat Monument (~2.56.km), Tele Tower (~4.86.km), Moksh (~7.76.km), and Ergeb Washa (~11.02.km).

Description of actual services provided by your staff within the assignment:


Alternative Routes Assessment and Route Selection taking into consideration

Employer’s requirement stated in the main contract agreement, national and international standards

Fitness for intended purpose

Response to the demands of the society and the local administration

Undertake GPS establishment

Interpret all kind of geotechnical investigations for deep cut, high fill and foundation for major structures

Designing of the roadway and any necessary structures

Design an upgrade for existing section as well as new alignment section of the road to DC5 geometric standard with AC surfacing.

Designing Bridges and culvert structures on the assumption that all existing structures shall be removed and reconstructed in order to meet the required standard

Designing Paved Roadways

Designing Drainage structures

Designing Retaining Walls

Designing erosion protection and energy dissipaters

Designing sediment trap and detention basin

Designing Pavement Markings and Traffic & Direction Signs

Designing Protection Works such as guard rails, gabions, grassing, etc

Preparation of Design document

Preparation of quality assurance/quality control

Preparation of quality management program of implementation

Preparation of construction specification package

Preparation of Environmental Assessment Plan

Preparation of design for ancillary works

Preparation of detailed quantity and Detailed project cost analysis report (in relation to hauling distance and designed pavement thickness)

And other necessary works to meet the Employer’s requirement for fulfillment of completion of the project

Project Name: Consultancy service for Detail Engineering Design and Working Drawing Preparation Design and Build of Debretabor –Guna Kimer Dingay-Guna Road Project.  
Country:   ETHIOPIA Location within Country:  Amhara Regional State  
Name of Client:   Samson Cherinet General Contractor  
Address of Client: Bole Sub-City Kebele 13 Addis Ababa, Ethiopia  
Start Date July 1 2020  
Name of associated consultants, if any: none  
  Name of Senior professional staff of our firm involved and functions performed (such as Project Director/Coordinator, Team Leader):  
  Narrative description of Project: The road project is entirely located in the Amhara Regional State. The Project Road starts around 2.8km from Kimir Dingay, on Debretabor-Gahena Road and Ends below Guna Mountain. The project road passes through only 3 intermediate control points that is the Guna Mountain Semaetat Monument (~2.56.km), Tele Tower (~4.86.km), Moksh (~7.76.km), and Ergeb Washa (~11.02.km).
Description of actual services provided by your staff within the assignment:   ü  Alternative Routes Assessment and Route Selection taking into consideration v  Employer’s requirement stated in the main contract agreement, national and international standards v  Fitness for intended purpose v  Response to the demands of the society and the local administration ü  Undertake GPS establishment ü  Interpret all kind of geotechnical investigations for deep cut, high fill and foundation for major structures ü  Designing of the roadway and any necessary structures ü  Design an upgrade for existing section as well as new alignment section of the road to DC5 geometric standard with AC surfacing. ü  Designing Bridges and culvert structures on the assumption that all existing structures shall be removed and reconstructed in order to meet the required standard ü  Designing Paved Roadways ü  Designing Drainage structures ü  Designing Retaining Walls ü  Designing erosion protection and energy dissipaters ü  Designing sediment trap and detention basin ü  Designing Pavement Markings and Traffic & Direction Signs ü  Designing Protection Works such as guard rails, gabions, grassing, etc ü  Preparation of Design document ü  Preparation of quality assurance/quality control ü  Preparation of quality management program of implementation ü  Preparation of construction specification package ü  Preparation of Environmental Assessment Plan ü  Preparation of design for ancillary works ü  Preparation of detailed quantity and Detailed project cost analysis report (in relation to hauling distance and designed pavement thickness) ü  And other necessary works to meet the Employer’s requirement for fulfillment of completion of the project
Project Name: Consultancy service for Detail Engineering Design and Working Drawing Preparation Design and Build of Hayk-Bistima-Chifra Road Project.   Approx. value of the contract (in ETB) 9.246 million ETB Only
Country:   ETHIOPIA Location within Country:  Amhara Regional State Duration of assignment (month): 6 Month  
Name of Client:   POWERCON PLC in JV with ASER Construction PLC   Total No of staff-months of the assignment: 10
Address of Client: Yeka Sub-City Wereda 09 Addis Ababa, Ethiopia Approx. value of the services provided by your firm (in ETB), 9.246 million ETB Only
Start Date                       August 2020 Completion date February 2020
Name of associated consultants, if any: none No of professional staff-months provided by associated Consultants: none
  Name of Senior professional staff of our firm involved and functions performed (such as Project Director/Coordinator, Team Leader): 1.Merawi Teklemariam           Highway Engineer 2.Sofonias Loulseged             Quantity Surveyor 3.Behailu Tsegaye                    Senior Hydrologist/Hydraulic Engineer 4. Haileyesus Mulgeta             Pavement/Material Engineer 5. Samuel H/Michale                Senior Structural Engineer 6. Kassahun Tassew                 Contract Engineer 7. Mekuriya H/Yohannis          Environmentalist 8. Nebiyu Giday                        Geotechnical Engineer 9.Girma Gultei                        Senior Surveyor Description of actual services provided by your staff within the assignment:  
  • Alternative Routes Assessment and Route Selection taking into consideration
  • Employer’s requirement stated in the main contract agreement, national and international standards
  • Fitness for intended purpose
  • Response to the demands of the society and the local administration
  • Undertake GPS establishment
  • Interpret all kind of geotechnical investigations for deep cut, high fill and foundation for major structures
  • Designing of the roadway and any necessary structures
  • Design an upgrade for existing section as well as new alignment section of the road to DC5 geometric standard with AC surfacing.
  • Designing Bridges and culvert structures on the assumption that all existing structures shall be removed and reconstructed in order to meet the required standard
  • Designing Paved Roadways
  • Designing Drainage structures
  • Designing Retaining Walls
  • Designing erosion protection and energy dissipaters
  • Designing sediment trap and detention basin
  • Designing Pavement Markings and Traffic & Direction Signs
  • Designing Protection Works such as guard rails, gabions, grassing, etc
  • Preparation of Design document
  • Preparation of quality assurance/quality control
  • Preparation of quality management program of implementation
  • Preparation of construction specification package
  • Preparation of Environmental Assessment Plan
  • Preparation of design for ancillary works
  • Preparation of detailed quantity and Detailed project cost analysis report (in relation to hauling distance and designed pavement thickness)
And other necessary works to meet the Employer’s requirement for fulfillment of completion of the project
Project Name: Consultancy service for Detail Engineering Design and Working Drawing Preparation Design and Build of Hayk-Bistima-Chifra Road Project.   Approx. value of the contract (in ETB) 9.246 million ETB Only
Country:   ETHIOPIA Location within Country:  Amhara Regional State Duration of assignment (month): 6 Month  
Name of Client:   POWERCON PLC in JV with ASER Construction PLC   Total No of staff-months of the assignment: 10
Address of Client: Yeka Sub-City Wereda 09 Addis Ababa, Ethiopia Approx. value of the services provided by your firm (in ETB), 9.246 million ETB Only
Start Date                       August 2020 Completion date February 2020
Name of associated consultants, if any: none No of professional staff-months provided by associated Consultants: none
  Name of Senior professional staff of our firm involved and functions performed (such as Project Director/Coordinator, Team Leader): 1.Merawi Teklemariam           Highway Engineer 2.Sofonias Loulseged             Quantity Surveyor 3.Behailu Tsegaye                    Senior Hydrologist/Hydraulic Engineer 4. Haileyesus Mulgeta             Pavement/Material Engineer 5. Samuel H/Michale                Senior Structural Engineer 6. Kassahun Tassew                 Contract Engineer 7. Mekuriya H/Yohannis          Environmentalist 8. Nebiyu Giday                        Geotechnical Engineer 9.Girma Gultei                        Senior Surveyor Description of actual services provided by your staff within the assignment:  
  • Alternative Routes Assessment and Route Selection taking into consideration
  • Employer’s requirement stated in the main contract agreement, national and international standards
  • Fitness for intended purpose
  • Response to the demands of the society and the local administration
  • Undertake GPS establishment
  • Interpret all kind of geotechnical investigations for deep cut, high fill and foundation for major structures
  • Designing of the roadway and any necessary structures
  • Design an upgrade for existing section as well as new alignment section of the road to DC5 geometric standard with AC surfacing.
  • Designing Bridges and culvert structures on the assumption that all existing structures shall be removed and reconstructed in order to meet the required standard
  • Designing Paved Roadways
  • Designing Drainage structures
  • Designing Retaining Walls
  • Designing erosion protection and energy dissipaters
  • Designing sediment trap and detention basin
  • Designing Pavement Markings and Traffic & Direction Signs
  • Designing Protection Works such as guard rails, gabions, grassing, etc
  • Preparation of Design document
  • Preparation of quality assurance/quality control
  • Preparation of quality management program of implementation
  • Preparation of construction specification package
  • Preparation of Environmental Assessment Plan
  • Preparation of design for ancillary works
  • Preparation of detailed quantity and Detailed project cost analysis report (in relation to hauling distance and designed pavement thickness)
And other necessary works to meet the Employer’s requirement for fulfillment of completion of the project
Project Name: Consultancy service for Detail Engineering Design and Working Drawing Preparation Design and Build of Debretabor –Guna Kimer Dingay-Guna Road Project.  
Country:   ETHIOPIA Location within Country:  Amhara Regional State  
Name of Client:   Samson Cherinet General Contractor  
Address of Client: Bole Sub-City Kebele 13 Addis Ababa, Ethiopia  
Start Date July 1 2020  
Name of associated consultants, if any: none  
  Name of Senior professional staff of our firm involved and functions performed (such as Project Director/Coordinator, Team Leader):  
  Narrative description of Project: The road project is entirely located in the Amhara Regional State. The Project Road starts around 2.8km from Kimir Dingay, on Debretabor-Gahena Road and Ends below Guna Mountain. The project road passes through only 3 intermediate control points that is the Guna Mountain Semaetat Monument (~2.56.km), Tele Tower (~4.86.km), Moksh (~7.76.km), and Ergeb Washa (~11.02.km).
Description of actual services provided by your staff within the assignment:   ü  Alternative Routes Assessment and Route Selection taking into consideration v  Employer’s requirement stated in the main contract agreement, national and international standards v  Fitness for intended purpose v  Response to the demands of the society and the local administration ü  Undertake GPS establishment ü  Interpret all kind of geotechnical investigations for deep cut, high fill and foundation for major structures ü  Designing of the roadway and any necessary structures ü  Design an upgrade for existing section as well as new alignment section of the road to DC5 geometric standard with AC surfacing. ü  Designing Bridges and culvert structures on the assumption that all existing structures shall be removed and reconstructed in order to meet the required standard ü  Designing Paved Roadways ü  Designing Drainage structures ü  Designing Retaining Walls ü  Designing erosion protection and energy dissipaters ü  Designing sediment trap and detention basin ü  Designing Pavement Markings and Traffic & Direction Signs ü  Designing Protection Works such as guard rails, gabions, grassing, etc ü  Preparation of Design document ü  Preparation of quality assurance/quality control ü  Preparation of quality management program of implementation ü  Preparation of construction specification package ü  Preparation of Environmental Assessment Plan ü  Preparation of design for ancillary works ü  Preparation of detailed quantity and Detailed project cost analysis report (in relation to hauling distance and designed pavement thickness) ü  And other necessary works to meet the Employer’s requirement for fulfillment of completion of the project