Assosa Town Internal Asphalt, Design and Build Road Project

Assosa Town

Project location: Within Ethiopia, Benishangul Gumuz Regional State

Project type: Asphalt Concrete 

Value of the Project:

Value of the contract: 3,319,015.00 ETB

Start Date: November 2021

Name of Client: Crossland Construction

Progress Status
72%
Description of actual services provided by your staff within the assignment:

 

Employer’s requirement stated in the main contract agreement, national and international standards

Fitness for intended purpose

Response to the demands of the society and the local administration

Undertake GPS establishment

Interpret all kind of geotechnical investigations for deep cut, high fill and foundation for major structures

Designing of the roadway and any necessary structures

Design an upgrade for existing section as well as new alignment section of the road to DC5 geometric standard with AC surfacing.

Designing Bridges and culvert structures on the assumption that all existing structures shall be removed and reconstructed in order to meet the required standard

Designing Paved Roadways, drainage structures, retaining Walls, erosion protection and energy dissipaters, sediment trap and detention basin, pavement Markings and Traffic & Direction Signs, protection Works such as guard rails, gabions, grassing, etc

Preparation of Design document, quality assurance/quality control & management program of implementation

Preparation of construction specification package, environmental assessment plan

Preparation of design for ancillary works

Preparation of detailed quantity and Detailed project cost analysis report (in relation to hauling distance and designed pavement thickness)

And other necessary works to meet the Employer’s requirement for fulfillment of completion of the project

Project Name: Assosa Town Internal Asphalt, Design & Build Road Project Value of the contract (in ETB) 3,319,015.00 ETB
Country:   ETHIOPIA Location within Country: Benishangul Gumz Regional State Duration of assignment (month): 12 Months  
Name of Client:   CROSSLAND Construction.   Total No of staff-months of the assignment:
Address of Client: Addis Ababa, Ethiopia Approx. value of the services provided by your firm (in ETB), 3,319,015.00 ETB only
Start Date November, 2021 Completion date, November, 2022
Name of Senior professional staff of our firm involved and functions performed (such as Project Director/Coordinator, Team Leader)
Description of actual services provided by your staff within the assignment: Alternative Routes Assessment and Route Selection taking into consideration ·         Employer’s requirement stated in the main contract agreement, national and international standards ·         Fitness for intended purpose ·         Response to the demands of the society and the local administration
  • Undertake GPS establishment
  • Interpret all kind of geotechnical investigations for deep cut, high fill and foundation for major structures
  • Designing of the roadway and any necessary structures
  • Design an upgrade for existing section as well as new alignment section of the road to DC5 geometric standard with AC surfacing.
  • Designing Bridges and culvert structures on the assumption that all existing structures shall be removed and reconstructed in order to meet the required standard
  • Designing Paved Roadways
  • Designing Drainage structures
  • Designing Retaining Walls
  • Designing erosion protection and energy dissipaters
  • Designing sediment trap and detention basin
  • Designing Pavement Markings and Traffic & Direction Signs
  • Designing Protection Works such as guard rails, gabions, grassing, etc
  • Preparation of Design document
  • Preparation of quality assurance/quality control
  • Preparation of quality management program of implementation
  • Preparation of construction specification package
  • Preparation of Environmental Assessment Plan
  • Preparation of design for ancillary works
  • Preparation of detailed quantity and Detailed project cost analysis report (in relation to hauling distance and designed pavement thickness)
  • And other necessary works to meet the Employer’s requirement for fulfillment of completion of the project